Call Us Today

+263717709715

Address

2336 Mkoba 7, Gweru, Zimbabwe

Core Construction

Steel Fixing & Decking

Reinforced strength for concrete slabs and multi-story structures — engineered with precision.

The Hidden Strength of Your Building

Steel reinforcement is the backbone of every concrete structure. Our experienced teams install rebar, wire mesh, and temporary deck formwork with engineering precision, ensuring solid concrete slabs and multi-story structural integrity that meets Zimbabwean building standards.

What's Included

  • Rebar installation and wire mesh binding to exact structural specifications
  • Temporary deck formwork for suspended slabs, beams, and staircases
  • Strict adherence to load-bearing and spacing requirements per engineer's drawings
  • Inspection and testing of steelwork before concrete pours
  • Proper placement of cover blocks to prevent corrosion
  • Demolition and removal of formwork after concrete reaches required strength

Our Steel Fixing & Decking Process

1. Review Structural Drawings

We study the engineer's drawings to determine rebar sizes, spacing, and formwork requirements.

2. Cut & Bend Rebar

Reinforcing bars are cut, bent, and positioned according to the approved schedule.

3. Install Formwork & Decking

Temporary decking is erected and braced to support the wet concrete load until curing.

4. Inspection & Concrete Pour

We verify all steelwork and formwork before concrete placement, then supervise the pour.

Why Choose LYNBRICK for Steel Fixing & Decking?

Certified Steel Fixers

Our team is trained in modern steel fixing techniques and safety protocols for reinforced concrete.

Engineering Accuracy

We follow structural drawings to the millimetre, ensuring correct bar spacing and lap lengths.

Quality Assurance

Each stage is inspected to guarantee the structural integrity of your concrete members.

Frequently Asked Questions

What size rebar do you typically use?

We use rebar sizes from 10mm to 25mm depending on the structural requirements, as specified in the engineer's drawings.

How long does formwork stay in place?

Formwork for slabs and beams is typically removed after 7–14 days, depending on concrete strength and weather conditions. Props may remain longer for safety.

Do you provide decking for multi-story buildings?

Yes, we have experience with suspended slabs and multi-story decking using engineered formwork systems and props.

Reinforce Your Project with LYNBRICK Steel Fixing

Get a detailed quote for your steel fixing and decking needs. From single slabs to multi-story structures, we ensure structural integrity every step of the way.